Bridge City Estate
Community 14, Tema · 2023
Community 14, Tema: a block of 4,645 square metres with three buildings already standing on it, and a developer who wanted the rest of it planned. The estate has fifteen houses, all of them two storeys. That is about 310 square metres a house with the road and the gutters still in the figure.
We were brought in for the layout before any house was drawn, which on an estate is the order that decides everything after it. A house plan can be redrawn in a week, a road cannot, so the line of the street and the depth of the plots stop being negotiable once they are set. The three existing buildings were part of that starting geometry rather than something to design around later.
The building plans came next, and they cover about three quarters of the estate. The remaining plots were sold to buyers who wanted to run their own build, so the street had to work for houses we would not be drawing, which is a test a single plot never sets.
- Location
- Community 14, Tema, Greater Accra, Ghana
- Client
- Bridge City Properties
- Disciplines
- Architecture, Landscape
- Role
- Architect and landscape architect
- Site area
- 4,645 m²
- Houses
- Fifteen, two storeys
- Status
- Design complete, partly built
What to notice
The corner house was never sold. Bridge City kept their prime plot, so it is the one frontage on the street that belongs to the developer from the boundary wall inwards; everywhere else the wall and the gate belong to whoever bought the plot. It works as the sample. What the rest of the street was drawn to be is standing on the corner, which is where most people will see it from.
Where this stops being true
In these images every frontage agrees with the one next to it. Some of that is contracted and some is not. Setbacks were agreed before any plot was sold, so the building line holds the length of the street whoever builds on it. Wall heights and gates were left to the buyers, and a wall and a gate are most of what you see of a house from the road. Houses are going up on those plots now, so this is being settled rather than predicted.
Drainage was fixed up front as well. The gutters run the full length of the road on both sides, and every plot takes them. On ground this flat the line only works if it is continuous, so an owner who bridges a stretch badly or fills it affects every plot downstream of theirs. The street is held where the water goes and where the buildings stand, and left open where it shows most. This is written up in full in the note What you can fix before the plots are sold.